Plot drainage & erosion control
Cut-off drains, grouted stone pitching, gabions and grassing for a typical residential plot on a slope.
What the bill measures
| Item | Qty | Unit |
|---|---|---|
| Excavate drain to profile (mitre/side drain) | 120 | LM |
| Stone pitching to drains 150mm grouted | 60 | m2 |
| Scour check in masonry | 6 | No. |
| Gabion boxes 2x1x1m filled & laced | 12 | No. |
| Grassing / topsoiling to slopes | 150 | m2 |
Preliminaries and the contractor's own obligations (Bills 1 and 9) are added to the project too, unpriced. Items the library has no rate for — manholes, catchpits, small-bore pipes, trench support, and the contractor's own obligations in Bills 1 and 9 — are measured in full and left at nil for you to price. On a tender you are issuing that is the correct form: the rate column is the question. On one you are pricing, those are the lines to put your own build-up against first.