Kenya construction prices — October 2026

Indicative Nairobi-region prices for common building materials, labour (fundi) and plant hire — shown as a typical range, with the median of prices used in real JengaCost BOQs and a market check from prices listed by online retailers, where enough reports exist.

Every figure carries its survey date. Always verify with your local suppliers before committing — prices vary by county, quantity and season.

Materials
ItemUnit Typical (KES) Range Community median Market check As of
Ballast 3/4 inch tonne 2,400 2,000–3,000 collecting… — Jul 2026
Binding wire kg 200 170–240 collecting… — Jul 2026
BRC mesh A142 roll 15,500 13,500–17,500 collecting… — Jul 2026
Building sand (plaster) tonne 3,200 2,800–4,000 collecting… — Jul 2026
Cement 50kg bag (32.5R) bag 760 680–850 collecting… — Jul 2026
Cement 50kg bag (42.5N) bag 880 800–980 collecting… — Jul 2026
Ceramic floor tiles m2 1,250 950–1,700 collecting… — Jul 2026
DPC roll 1m wide roll 1,800 1,500–2,200 collecting… — Jul 2026
GI pipe 1/2 inch piece (6m) 950 800–1,150 collecting… — Jul 2026
Glass 4mm clear m2 950 800–1,200 collecting… — Jul 2026
Hardcore tonne 1,500 1,200–1,900 collecting… — Jul 2026
Hoop iron roll 350 300–450 collecting… — Jul 2026
Iron sheet 30g box profile piece (3m) 1,450 1,300–1,650 collecting… — Jul 2026
Machine-cut stone 6x9 piece 42 35–55 collecting… — Jul 2026
Machine-cut stone 9x9 piece 55 45–70 collecting… — Jul 2026
Nails (assorted) kg 180 150–220 collecting… — Jul 2026
Paint - emulsion 4L tin 1,900 1,500–2,500 collecting… — Jul 2026
Paint - gloss 4L tin 2,700 2,200–3,300 collecting… — Jul 2026
PVC pipe 4 inch piece (6m) 1,450 1,250–1,700 collecting… — Jul 2026
Ribbed bar Y10 piece (12m) 780 680–900 collecting… — Jul 2026
Ribbed bar Y12 piece (12m) 1,150 980–1,300 collecting… — Jul 2026
Ribbed bar Y16 piece (12m) 2,050 1,750–2,350 collecting… — Jul 2026
Ribbed bar Y8 piece (12m) 500 430–580 collecting… — Jul 2026
River sand tonne 3,000 2,500–3,800 collecting… — Jul 2026
Timber 2x2 cypress ft 24 20–30 collecting… — Jul 2026
Timber 4x2 cypress ft 48 40–60 collecting… — Jul 2026
Waterproof cement additive kg 300 250–380 collecting… — Jul 2026
Labour (fundi) rates
ItemUnit Typical (KES) Range Community median Market check As of
Carpenter day 1,500 1,200–2,000 collecting… — Jul 2026
Electrician day 1,800 1,500–2,500 collecting… — Jul 2026
Painter day 1,300 1,000–1,700 collecting… — Jul 2026
Plumber day 1,800 1,500–2,500 collecting… — Jul 2026
Skilled mason (fundi) day 1,500 1,200–2,000 collecting… — Jul 2026
Steel fixer day 1,500 1,200–1,900 collecting… — Jul 2026
Unskilled labourer (mjengo) day 800 600–1,000 collecting… — Jul 2026
Plant & equipment hire
ItemUnit Typical (KES) Range Community median Market check As of
Concrete mixer hire day 3,500 3,000–4,500 collecting… — Jul 2026
Excavator hire hour 5,500 4,500–7,000 collecting… — Jul 2026
Poker vibrator hire day 2,200 1,800–2,800 collecting… — Jul 2026
Tipper lorry hire (7t) trip 7,500 6,000–9,500 collecting… — Jul 2026
Water bowser 10,000L trip 9,500 8,000–12,000 collecting… — Jul 2026
Composite work rates (labour + materials)
ItemUnit Typical (KES) Range Community median Market check As of
A142 fabric reinforcement m2 479 479–479 collecting… — Jul 2023 verify
Backfilling excavations with excavated material m3 144 144–144 collecting… — Jul 2023 verify
Balustrade - mild steel & handrail LM 5,500 3,500–9,000 collecting… — Aug 2026
Bituminous felt DPC not exceeding 225mm wide m2 898 898–898 collecting… — Jul 2023 verify
Boundary wall (machine-cut stone) per metre run LM 5,200 3,800–7,000 collecting… — Aug 2026
Cabro paving on compacted base m2 1,750 1,400–2,400 collecting… — Aug 2026
Ceiling - gypsum on brandering m2 1,500 1,200–1,900 collecting… — Jul 2026
Ceramic floor tiling incl. bedding m2 2,600 2,200–3,300 collecting… — Jul 2026
Compacting bottoms of excavations m2 40 40–40 collecting… — Jul 2023 verify
Concrete moulded roof band LM 1,800 1,400–2,200 collecting… — Sep 2026
Disposal of excavated material off site m3 360 360–360 collecting… — Jul 2023 verify
Electrical point (lighting/power) No. 2,800 2,200–3,600 collecting… — Jul 2026
Fascia board & gutters LM 1,000 800–1,300 collecting… — Jul 2026
Floor screed 32mm m2 650 550–850 collecting… — Jul 2026
Flush door incl. frame & ironmongery No. 15,000 12,000–19,000 collecting… — Jul 2026
Formwork to edges of beds not exceeding 250mm high m 120 120–120 collecting… — Jul 2023 verify
Formwork to edges of suspended slabs not exceeding 250mm high m 120 120–120 collecting… — Jul 2023 verify
Formwork to sides of beams m2 399 399–399 collecting… — Jul 2023 verify
Formwork to sloping soffits of staircases m2 399 399–399 collecting… — Jul 2023 verify
Formwork to soffits of slabs m2 399 399–399 collecting… — Jul 2023 verify
Foundation walling (machine-cut stone) m2 2,200 1,800–2,800 collecting… — Jul 2026
Ground slab concrete 1:2:4 incl. mesh & DPM m2 2,200 1,800–2,700 collecting… — Jul 2026
Hardcore filling, compacted m2 450 350–600 collecting… — Jul 2026
Hedge planting incl. topsoil LM 700 400–1,300 collecting… — Aug 2026
High yield bar reinforcement, cut, bent and fixed t 143,730 143,730–143,730 collecting… — Jul 2023 verify
Mass concrete 1:3:6 in foundation m3 16,500 14,000–20,000 collecting… — Jul 2026
Mazeras stone cladding - slabs bedded in mortar m2 1,350 1,200–1,500 collecting… — Oct 2026
Natural stone cladding - random slabs bedded in mortar m2 2,000 1,800–2,300 collecting… — Oct 2026
Painting - 3 coats emulsion m2 320 250–420 collecting… — Jul 2026
Paved footpath on compacted base m2 1,250 950–1,700 collecting… — Aug 2026
Pergola - timber on steel posts m2 9,500 6,000–16,000 collecting… — Aug 2026
Planting bed incl. topsoil & shrubs m2 1,100 600–2,200 collecting… — Aug 2026
Plaster & key (per face) m2 700 550–900 collecting… — Jul 2026
Plastic water tank incl. plumbing & fittings No. 38,000 22,000–75,000 collecting… — Aug 2026
Plumbing - wet room complete Item 60,000 45,000–85,000 collecting… — Jul 2026
QS A142 mesh fabric in beds, 200mm laps m2 606 606–606 collecting… — Jul 2023 verify
QS Aluminium stair railing LM 9,818 9,818–9,818 collecting… — Jul 2023 verify
QS Anti-termite treatment to ground m2 354 354–354 collecting… — Jul 2023 verify
QS Backfill with selected excavated material m3 182 182–182 collecting… — Jul 2023 verify
QS Bathroom mirror 600x450 bevelled No. 4,545 4,545–4,545 collecting… — Jul 2023 verify
QS Bituminous felt DPC 200mm wide LM 227 227–227 collecting… — Jul 2023 verify
QS Bituminous paint two coats to plinth render m2 354 354–354 collecting… — Jul 2023 verify
QS Brass butt hinges 150mm, per pair Prs 571 571–571 collecting… — Jul 2023 verify
QS Burnt clay window cill 150mm LM 657 657–657 collecting… — Jul 2023 verify
QS Cement sand render 12mm (1:4) m2 505 505–505 collecting… — Jul 2023 verify
QS Cement sand screed 40mm to receive tiles m2 505 505–505 collecting… — Jul 2023 verify
QS Ceramic floor tiles 300x300 m2 1,818 1,818–1,818 collecting… — Jul 2023 verify
QS Clear sheet glass 5mm glazed to metal m2 1,515 1,515–1,515 collecting… — Jul 2023 verify
QS Clear site of grass, shrubs and small trees m2 61 61–61 collecting… — Jul 2023 verify
QS Curtain rod, polished brass, per metre LM 2,828 2,828–2,828 collecting… — Jul 2023 verify
QS Excavate foundation trenches not exceeding 1.5m deep m3 424 424–424 collecting… — Jul 2023 verify
QS Excavate oversite to remove topsoil 150mm m2 101 101–101 collecting… — Jul 2023 verify
QS Flush door 800x2400 semi-solid plywood faced No. 6,566 6,566–6,566 collecting… — Jul 2023 verify
QS Flush door 900x2400 solid core mahogany veneer No. 9,293 9,293–9,293 collecting… — Jul 2023 verify
QS Formwork to edges 75-150mm LM 152 152–152 collecting… — Jul 2023 verify
QS Formwork to faces of risers LM 152 152–152 collecting… — Jul 2023 verify
QS Formwork to vertical sides and soffits m2 505 505–505 collecting… — Jul 2023 verify
QS Glazed ceramic wall tiles 200x300 m2 1,717 1,717–1,717 collecting… — Jul 2023 verify
QS Gloss paint to metal, undercoat and two coats m2 253 253–253 collecting… — Jul 2023 verify
QS Grey PVC downpipe 100mm with holderbats LM 859 859–859 collecting… — Jul 2023 verify
QS Hardcore filling 300mm compacted in 150mm layers m2 545 545–545 collecting… — Jul 2023 verify
QS High yield bar reinforcement kg 182 182–182 collecting… — Jul 2023 verify
QS Keep excavations free of water Item 20,202 20,202–20,202 collecting… — Jul 2023 verify
QS Kitchen overhead cupboard 1200mm No. 6,545 6,545–6,545 collecting… — Jul 2023 verify
QS Kitchen undersink cupboard 1800mm with worktop No. 29,455 29,455–29,455 collecting… — Jul 2023 verify
QS Lightweight screed to falls 50mm average m2 606 606–606 collecting… — Jul 2023 verify
QS Load and cart away surplus excavated material m3 455 455–455 collecting… — Jul 2023 verify
QS Mahogany architrave 40x25 LM 354 354–354 collecting… — Jul 2023 verify
QS Mahogany door frame 150x50 LM 1,515 1,515–1,515 collecting… — Jul 2023 verify
QS Mahogany landing boarding m2 1,818 1,818–1,818 collecting… — Jul 2023 verify
QS Mahogany quadrant 25mm LM 253 253–253 collecting… — Jul 2023 verify
QS Mahogany stair riser 150x40 LM 177 177–177 collecting… — Jul 2023 verify
QS Mahogany stair tread 325x40 LM 354 354–354 collecting… — Jul 2023 verify
QS Manhole up to 1.0m deep complete with cover No. 18,182 18,182–18,182 collecting… — Jul 2023 verify
QS Mass concrete 1:3:6 blinding 50mm m2 505 505–505 collecting… — Jul 2023 verify
QS Murram blinding 50mm to hardcore m2 283 283–283 collecting… — Jul 2023 verify
QS Non-slip ceramic floor tiles 300x300 m2 2,020 2,020–2,020 collecting… — Jul 2023 verify
QS Obscure sheet glass 5mm glazed to metal m2 1,616 1,616–1,616 collecting… — Jul 2023 verify
QS Planking and strutting to excavations Item 20,202 20,202–20,202 collecting… — Jul 2023 verify
QS Polythene underlay 500 gauge m2 152 152–152 collecting… — Jul 2023 verify
QS Polyurethane varnish three coats to wood m2 253 253–253 collecting… — Jul 2023 verify
QS Precast concrete coping 300x100 LM 657 657–657 collecting… — Jul 2023 verify
QS Prime architraves and quadrants before fixing LM 61 61–61 collecting… — Jul 2023 verify
QS Prime frames before fixing LM 121 121–121 collecting… — Jul 2023 verify
QS PVC vent sleeve 100mm with gauze No. 182 182–182 collecting… — Jul 2023 verify
QS Recessed pointing to stonework m2 455 455–455 collecting… — Jul 2023 verify
QS Reinforced concrete 1:2:4 slab 150mm m2 1,894 1,894–1,894 collecting… — Jul 2023 verify
QS Reinforced concrete 1:2:4 vibrated m3 12,626 12,626–12,626 collecting… — Jul 2023 verify
QS Roof outlet No. 2,020 2,020–2,020 collecting… — Jul 2023 verify
QS Screed to roof skirting 150mm LM 101 101–101 collecting… — Jul 2023 verify
QS Shower fitting No. 6,061 6,061–6,061 collecting… — Jul 2023 verify
QS Silk vinyl emulsion, undercoat and two coats m2 404 404–404 collecting… — Jul 2023 verify
QS Soap dish No. 2,424 2,424–2,424 collecting… — Jul 2023 verify
QS Stainless steel double bowl sink 1800x600 No. 14,646 14,646–14,646 collecting… — Jul 2023 verify
QS Steel casement window, burglar proofed, per m2 of opening m2 6,061 6,061–6,061 collecting… — Jul 2023 verify
QS Steel panel door 900x2400 with lock and burglar proofing No. 20,727 20,727–20,727 collecting… — Jul 2023 verify
QS Stone walling 200mm in cement mortar 1:4, hoop iron m2 1,818 1,818–1,818 collecting… — Jul 2023 verify
QS Terrazzo paving 15mm on screed m2 2,424 2,424–2,424 collecting… — Jul 2023 verify
QS Terrazzo skirting LM 364 364–364 collecting… — Jul 2023 verify
QS Three-lever mortice deadlock No. 4,924 4,924–4,924 collecting… — Jul 2023 verify
QS Tile skirting 100mm LM 182 182–182 collecting… — Jul 2023 verify
QS Toilet roll holder No. 2,424 2,424–2,424 collecting… — Jul 2023 verify
QS Trim and level bottoms of excavations m2 51 51–51 collecting… — Jul 2023 verify
QS Two-lever mortice lock No. 3,283 3,283–3,283 collecting… — Jul 2023 verify
QS uPVC drain pipe 160mm in trench with haunching LM 1,465 1,465–1,465 collecting… — Jul 2023 verify
QS Varnish to stair risers LM 91 91–91 collecting… — Jul 2023 verify
QS Wardrobe 1800x600x2700 mahogany blockboard No. 19,636 19,636–19,636 collecting… — Jul 2023 verify
QS Wash hand basin with pillar tap and trap No. 12,626 12,626–12,626 collecting… — Jul 2023 verify
QS Waterproofing application to flat roof m2 1,414 1,414–1,414 collecting… — Jul 2023 verify
QS Waterproofing to roof skirting 150mm LM 212 212–212 collecting… — Jul 2023 verify
QS WC suite with cistern and seat No. 14,141 14,141–14,141 collecting… — Jul 2023 verify
QS Weatherguard emulsion three coats externally m2 455 455–455 collecting… — Jul 2023 verify
Reinforced concrete 1:2:4 in beams m3 9,981 9,981–9,981 collecting… — Jul 2023 verify
Reinforced concrete 1:2:4 in beds not exceeding 150mm m3 9,981 9,981–9,981 collecting… — Jul 2023 verify
Reinforced concrete 1:2:4 in slabs 150-450mm m3 9,981 9,981–9,981 collecting… — Jul 2023 verify
Reinforced concrete 1:2:4 in staircases m3 9,981 9,981–9,981 collecting… — Jul 2023 verify
Reinforced concrete columns incl. reinforcement m3 38,000 32,000–46,000 collecting… — Aug 2026
Reinforced concrete staircase No. 130,000 95,000–180,000 collecting… — Aug 2026
Ring beam concrete incl. reinforcement LM 1,700 1,400–2,100 collecting… — Jul 2026
Roof covering - 30g box profile sheets m2 1,150 950–1,400 collecting… — Jul 2026
Roof structure - timber trusses m2 1,700 1,400–2,200 collecting… — Jul 2026
Screed to falls on flat roof 50mm average m2 479 479–479 collecting… — Jul 2023 verify
Septic tank & soak pit (standard) Item 150,000 120,000–200,000 collecting… — Jul 2026
Site clearance of open ground m2 90 60–140 collecting… — Aug 2026
Site clearance & setting out m2 150 120–200 collecting… — Jul 2026
Steel casement window incl. glazing m2 8,000 6,500–10,000 collecting… — Jul 2026
Steel external door incl. frame No. 22,000 18,000–28,000 collecting… — Jul 2026
Steel gate incl. frame & ironmongery No. 75,000 45,000–140,000 collecting… — Aug 2026
Strip foundation excavation m3 650 500–850 collecting… — Jul 2026
Superstructure walling (machine-cut stone) m2 2,300 1,900–2,900 collecting… — Jul 2026
Suspended slab concrete 1:2:4 incl. reinforcement m2 5,200 4,200–6,800 collecting… — Aug 2026
Swimming pool incl. shell, plant & finishes m2 57,000 45,000–85,000 collecting… — Aug 2026
Tank base / steel stand No. 45,000 25,000–90,000 collecting… — Aug 2026
Timber gazebo incl. roof & base No. 220,000 120,000–400,000 collecting… — Aug 2026
Topsoil & grass turfing m2 550 350–900 collecting… — Aug 2026
Vertical screen - fins or louvres m2 5,500 3,500–9,500 collecting… — Aug 2026
Waterproofing membrane to flat roof m2 1,118 1,118–1,118 collecting… — Jul 2023 verify
Waterproofing & screed to flat roof m2 1,450 1,100–1,900 collecting… — Aug 2026
Civil & road works (official schedule tier)
ItemUnit Typical (KES) Range Community median Market check As of
A142 mesh reinforcement laid official m2 550 450–700 collecting… — Jul 2026
Bush clearing (light vegetation) official m2 35 25–50 collecting… — Jul 2026
Cabro/paving block 60mm on sand bed official m2 1,800 1,450–2,350 collecting… — Jul 2026
Compaction of formation to 95% MDD official m2 70 55–95 collecting… — Jul 2026
Concrete blinding class 15/20 50mm official m2 560 450–720 collecting… — Jul 2026
Concrete class 20/20 in minor structures official m3 18,000 15,500–22,500 collecting… — Jul 2026
Concrete pipe culvert 600mm dia laid & jointed official LM 5,500 4,500–7,200 collecting… — Jul 2026
Concrete pipe culvert 900mm dia laid & jointed official LM 10,500 8,500–13,500 collecting… — Jul 2026
Culvert headwall/wingwall in masonry official No. 35,000 28,000–46,000 collecting… — Jul 2026
Dust control watering (bowser) official m2 20 15–30 collecting… — Jul 2026
Excavate drain to profile (mitre/side drain) official LM 240 180–330 collecting… — Jul 2026
Excavate in hard/rocky material official m3 1,200 900–1,600 collecting… — Jul 2026
Excavate to spoil in common material official m3 550 450–750 collecting… — Jul 2026
Fill from borrow incl. haul <5km official m3 1,000 800–1,300 collecting… — Jul 2026
Gabion boxes 2x1x1m filled & laced official No. 11,500 9,500–14,500 collecting… — Jul 2026
Grading & shaping road formation official m2 60 45–85 collecting… — Jul 2026
Grassing / topsoiling to slopes official m2 160 120–220 collecting… — Jul 2026
Guard rail w-beam supplied & fixed official LM 5,200 4,200–6,800 collecting… — Jul 2026
Hand-packed stone base 200mm official m2 800 650–1,050 collecting… — Jul 2026
Murram/gravel wearing course 150mm compacted official m3 1,950 1,600–2,500 collecting… — Jul 2026
Precast concrete kerb laid & bedded official LM 1,200 950–1,550 collecting… — Jul 2026
Road marking paint (continuous line) official LM 160 120–220 collecting… — Jul 2026
Scour check in masonry official No. 5,800 4,500–7,500 collecting… — Jul 2026
Site clearance & topsoil strip 150mm official m2 80 60–110 collecting… — Jul 2026
Stone pitching to drains 150mm grouted official m2 1,750 1,400–2,300 collecting… — Jul 2026
Turn these prices into a full Bill of Quantities

Free for your first 2 projects — totals, overheads and profit computed automatically.

Start free