Kenya construction prices — July 2026

Indicative Nairobi-region prices for common building materials, labour (fundi) and plant hire — shown as a typical range, with the median of prices used in real JengaCost BOQs and a market check from prices listed by online retailers, where enough reports exist.

Every figure carries its survey date. Always verify with your local suppliers before committing — prices vary by county, quantity and season.

Materials
ItemUnit Typical (KES) Range Community median Market check As of
Ballast 3/4 inch tonne 2,400 2,000–3,000 collecting… Jul 2026
Binding wire kg 200 170–240 collecting… Jul 2026
BRC mesh A142 roll 15,500 13,500–17,500 collecting… Jul 2026
Building sand (plaster) tonne 3,200 2,800–4,000 collecting… Jul 2026
Cement 50kg bag (32.5R) bag 760 680–850 collecting… Jul 2026
Cement 50kg bag (42.5N) bag 880 800–980 collecting… Jul 2026
Ceramic floor tiles m2 1,250 950–1,700 collecting… Jul 2026
DPC roll 1m wide roll 1,800 1,500–2,200 collecting… Jul 2026
GI pipe 1/2 inch piece (6m) 950 800–1,150 collecting… Jul 2026
Glass 4mm clear m2 950 800–1,200 collecting… Jul 2026
Hardcore tonne 1,500 1,200–1,900 collecting… Jul 2026
Hoop iron roll 350 300–450 collecting… Jul 2026
Iron sheet 30g box profile piece (3m) 1,450 1,300–1,650 collecting… Jul 2026
Machine-cut stone 6x9 piece 42 35–55 collecting… Jul 2026
Machine-cut stone 9x9 piece 55 45–70 collecting… Jul 2026
Nails (assorted) kg 180 150–220 collecting… Jul 2026
Paint - emulsion 4L tin 1,900 1,500–2,500 collecting… Jul 2026
Paint - gloss 4L tin 2,700 2,200–3,300 collecting… Jul 2026
PVC pipe 4 inch piece (6m) 1,450 1,250–1,700 collecting… Jul 2026
Ribbed bar Y10 piece (12m) 780 680–900 collecting… Jul 2026
Ribbed bar Y12 piece (12m) 1,150 980–1,300 collecting… Jul 2026
Ribbed bar Y16 piece (12m) 2,050 1,750–2,350 collecting… Jul 2026
Ribbed bar Y8 piece (12m) 500 430–580 collecting… Jul 2026
River sand tonne 3,000 2,500–3,800 collecting… Jul 2026
Timber 2x2 cypress ft 24 20–30 collecting… Jul 2026
Timber 4x2 cypress ft 48 40–60 collecting… Jul 2026
Waterproof cement additive kg 300 250–380 collecting… Jul 2026
Labour (fundi) rates
ItemUnit Typical (KES) Range Community median Market check As of
Carpenter day 1,500 1,200–2,000 collecting… Jul 2026
Electrician day 1,800 1,500–2,500 collecting… Jul 2026
Painter day 1,300 1,000–1,700 collecting… Jul 2026
Plumber day 1,800 1,500–2,500 collecting… Jul 2026
Skilled mason (fundi) day 1,500 1,200–2,000 collecting… Jul 2026
Steel fixer day 1,500 1,200–1,900 collecting… Jul 2026
Unskilled labourer (mjengo) day 800 600–1,000 collecting… Jul 2026
Plant & equipment hire
ItemUnit Typical (KES) Range Community median Market check As of
Concrete mixer hire day 3,500 3,000–4,500 collecting… Jul 2026
Excavator hire hour 5,500 4,500–7,000 collecting… Jul 2026
Poker vibrator hire day 2,200 1,800–2,800 collecting… Jul 2026
Tipper lorry hire (7t) trip 7,500 6,000–9,500 collecting… Jul 2026
Water bowser 10,000L trip 9,500 8,000–12,000 collecting… Jul 2026
Composite work rates (labour + materials)
ItemUnit Typical (KES) Range Community median Market check As of
Ceiling - gypsum on brandering m2 1,500 1,200–1,900 collecting… Jul 2026
Ceramic floor tiling incl. bedding m2 2,600 2,200–3,300 collecting… Jul 2026
Electrical point (lighting/power) No. 2,800 2,200–3,600 collecting… Jul 2026
Fascia board & gutters LM 1,000 800–1,300 collecting… Jul 2026
Floor screed 32mm m2 650 550–850 collecting… Jul 2026
Flush door incl. frame & ironmongery No. 15,000 12,000–19,000 collecting… Jul 2026
Foundation walling (machine-cut stone) m2 2,200 1,800–2,800 collecting… Jul 2026
Ground slab concrete 1:2:4 incl. mesh & DPM m2 2,200 1,800–2,700 collecting… Jul 2026
Hardcore filling, compacted m2 450 350–600 collecting… Jul 2026
Mass concrete 1:3:6 in foundation m3 16,500 14,000–20,000 collecting… Jul 2026
Painting - 3 coats emulsion m2 320 250–420 collecting… Jul 2026
Plaster & key (per face) m2 700 550–900 collecting… Jul 2026
Plumbing - wet room complete Item 60,000 45,000–85,000 collecting… Jul 2026
Ring beam concrete incl. reinforcement LM 1,700 1,400–2,100 collecting… Jul 2026
Roof covering - 30g box profile sheets m2 1,150 950–1,400 collecting… Jul 2026
Roof structure - timber trusses m2 1,700 1,400–2,200 collecting… Jul 2026
Septic tank & soak pit (standard) Item 150,000 120,000–200,000 collecting… Jul 2026
Site clearance & setting out m2 150 120–200 collecting… Jul 2026
Steel casement window incl. glazing m2 8,000 6,500–10,000 collecting… Jul 2026
Steel external door incl. frame No. 22,000 18,000–28,000 collecting… Jul 2026
Strip foundation excavation m3 650 500–850 collecting… Jul 2026
Superstructure walling (machine-cut stone) m2 2,300 1,900–2,900 collecting… Jul 2026
Civil & road works (official schedule tier)
ItemUnit Typical (KES) Range Community median Market check As of
A142 mesh reinforcement laid official m2 550 450–700 collecting… Jul 2026
Bush clearing (light vegetation) official m2 35 25–50 collecting… Jul 2026
Cabro/paving block 60mm on sand bed official m2 1,800 1,450–2,350 collecting… Jul 2026
Compaction of formation to 95% MDD official m2 70 55–95 collecting… Jul 2026
Concrete blinding class 15/20 50mm official m2 560 450–720 collecting… Jul 2026
Concrete class 20/20 in minor structures official m3 18,000 15,500–22,500 collecting… Jul 2026
Concrete pipe culvert 600mm dia laid & jointed official LM 5,500 4,500–7,200 collecting… Jul 2026
Concrete pipe culvert 900mm dia laid & jointed official LM 10,500 8,500–13,500 collecting… Jul 2026
Culvert headwall/wingwall in masonry official No. 35,000 28,000–46,000 collecting… Jul 2026
Dust control watering (bowser) official m2 20 15–30 collecting… Jul 2026
Excavate drain to profile (mitre/side drain) official LM 240 180–330 collecting… Jul 2026
Excavate in hard/rocky material official m3 1,200 900–1,600 collecting… Jul 2026
Excavate to spoil in common material official m3 550 450–750 collecting… Jul 2026
Fill from borrow incl. haul <5km official m3 1,000 800–1,300 collecting… Jul 2026
Gabion boxes 2x1x1m filled & laced official No. 11,500 9,500–14,500 collecting… Jul 2026
Grading & shaping road formation official m2 60 45–85 collecting… Jul 2026
Grassing / topsoiling to slopes official m2 160 120–220 collecting… Jul 2026
Guard rail w-beam supplied & fixed official LM 5,200 4,200–6,800 collecting… Jul 2026
Hand-packed stone base 200mm official m2 800 650–1,050 collecting… Jul 2026
Murram/gravel wearing course 150mm compacted official m3 1,950 1,600–2,500 collecting… Jul 2026
Precast concrete kerb laid & bedded official LM 1,200 950–1,550 collecting… Jul 2026
Road marking paint (continuous line) official LM 160 120–220 collecting… Jul 2026
Scour check in masonry official No. 5,800 4,500–7,500 collecting… Jul 2026
Site clearance & topsoil strip 150mm official m2 80 60–110 collecting… Jul 2026
Stone pitching to drains 150mm grouted official m2 1,750 1,400–2,300 collecting… Jul 2026