▙ JengaCost

Cost of building apartments in Kenya (2026)

A apartment block costs KES 13.1M to KES 320.5M to build in Kenya at standard finish, with a median of KES 42.7M, about KES 31,625 per m².

5 real designs, each drawn, in 3D and priced by the same engine and rates as every bill on JengaCost. Nairobi baseline, 2026 indicative rates. Pick one to change the county, the finish and the roof.

DesignFloor areaStoreysCost to buildPer m²
14-bedsitter block on an eighth acre · 14 units 414 m²3 KES 13,089,444 KES 31,625
8-flat apartment block on a quarter acre · 8 units 833 m²4 KES 21,697,500 KES 26,057
16-flat apartment scheme on a half acre · 16 units 1665 m²4 KES 42,706,401 KES 25,643
14-storey apartment tower · 26 units 3992 m²14 KES 133,297,464 KES 33,388
Twin 17-storey towers with pool on an acre · 64 units 9661 m²17 KES 320,497,059 KES 33,173

How much does it cost to build a apartment block in Kenya?

On 2026 indicative rates, the 5 apartment block designs on JengaCost cost from KES 13,089,444 to KES 320,497,059 to build at standard finish on the Nairobi baseline, with a median of KES 42,706,401. The figure covers the measured works, county approvals, the NCA levy and materials transport; land, professional fees and furniture are separate.

Does it cost more to build outside Nairobi?

It depends on the county. The same 16-flat apartment scheme on a half acre costs about KES 42,270,334 in Kiambu and KES 54,999,764 in Mandera, because materials, haulage and labour cost different amounts in each county. See building costs in every county.

What isn't in the price

The land, professional fees (architect, structural engineer, quantity surveyor), water and power connection fees, and furniture. Each design's own page lists its plot works (boundary wall, gate, driveway, septic tank) separately.

Price your own house

Pick a design and change the county, finish, roof and rooms, or describe your own, or upload your drawings. You get plans, 3D and a bill of quantities you can edit.

Browse the designs Open the cost explorer

Indicative 2026 figures for budgeting, not a quotation. Get the drawings and a priced bill checked by a registered architect, engineer and quantity surveyor before you build.