Cost of building apartments in Kenya (2026)
A apartment block costs KES 13.1M to KES 320.5M to build in Kenya at standard finish, with a median of KES 42.7M, about KES 31,625 per m².
5 real designs, each drawn, in 3D and priced by the same engine and rates as every bill on JengaCost. Nairobi baseline, 2026 indicative rates. Pick one to change the county, the finish and the roof.
| Design | Floor area | Storeys | Cost to build | Per m² |
|---|---|---|---|---|
| 14-bedsitter block on an eighth acre · 14 units | 414 m² | 3 | KES 13,089,444 | KES 31,625 |
| 8-flat apartment block on a quarter acre · 8 units | 833 m² | 4 | KES 21,697,500 | KES 26,057 |
| 16-flat apartment scheme on a half acre · 16 units | 1665 m² | 4 | KES 42,706,401 | KES 25,643 |
| 14-storey apartment tower · 26 units | 3992 m² | 14 | KES 133,297,464 | KES 33,388 |
| Twin 17-storey towers with pool on an acre · 64 units | 9661 m² | 17 | KES 320,497,059 | KES 33,173 |
How much does it cost to build a apartment block in Kenya?
On 2026 indicative rates, the 5 apartment block designs on JengaCost cost from KES 13,089,444 to KES 320,497,059 to build at standard finish on the Nairobi baseline, with a median of KES 42,706,401. The figure covers the measured works, county approvals, the NCA levy and materials transport; land, professional fees and furniture are separate.
Does it cost more to build outside Nairobi?
It depends on the county. The same 16-flat apartment scheme on a half acre costs about KES 42,270,334 in Kiambu and KES 54,999,764 in Mandera, because materials, haulage and labour cost different amounts in each county. See building costs in every county.
What isn't in the price
The land, professional fees (architect, structural engineer, quantity surveyor), water and power connection fees, and furniture. Each design's own page lists its plot works (boundary wall, gate, driveway, septic tank) separately.
Pick a design and change the county, finish, roof and rooms, or describe your own, or upload your drawings. You get plans, 3D and a bill of quantities you can edit.
Browse the designs Open the cost explorerIndicative 2026 figures for budgeting, not a quotation. Get the drawings and a priced bill checked by a registered architect, engineer and quantity surveyor before you build.