▙ JengaCost

Compare and decide

Set two to four houses side by side at Nairobi rates, say what matters to you, and see which fits and how you could build it with the money you have. How this works

From your county planning office.
Your allowance for surprises.
Cost to own
0 adds costs up in today's prices.
What matters most to you?
Start again from my brief

The ranking

Best fit for what you said
1. Karen 5-bedroom hipped-roof villa
KES 10,776,485
5 bed · 2 storeys · 386.3 m² · score 100/100
    To own over 30 years: KES 11,761,946
    KES 985,461 in repaints and replacements, 3 parts with no figure yet. Year by year
    Try a variant
    Side by side
    1. Karen 5-bedroom hipped-roof villa
    HouseKES 8,630,954
    Plot works (walls, gate, driveway, septic)KES 2,145,531
    TotalKES 10,776,485
    With 10% contingencyKES 11,854,134
    Repaints and replacements over 30 yearsKES 985,461
    Cost to own over 30 yearsKES 11,761,946
    Per m² of floor (house)KES 22,343
    Floor area386.3 m²
    Roofed footprint243.5 m²
    Bedrooms · storeys5 · 2
    Build programme45 weeks
    Not priced yetnothing

    Building in stages

    Enter the cash you have now and what you can add each month, above, to see when each stage can start and when the house is finished.

    1. Karen 5-bedroom hipped-roof villa — KES 11,854,134
    StageCostWeeks StartsSaving firstTimeline
    Approvals, permits and setting up KES 646,614 1 not paid for on these savings
    Foundations to floor slab KES 1,127,594 10 not paid for on these savings
    Walling, frame and upper floors KES 2,473,031 10 not paid for on these savings
    Roof KES 1,237,538 9 not paid for on these savings
    Doors, windows and services KES 1,821,380 2 not paid for on these savings
    Finishes and fittings KES 2,187,892 13 not paid for on these savings
    External works KES 2,360,084 alongside not paid for on these savings
    Total incl. 10% contingency KES 11,854,134

    Not in these figures. Budget for these separately:

    • Professional fees: architect, structural engineer and quantity surveyor (get quotes through JengaCost's marketplace).
    • The land, and its search, survey and transfer costs.
    • Water and power connection fees.
    • Furniture, curtains and appliances.

    Figures are budget estimates from JengaCost's dated rate library adjusted to Nairobi, not quotations. The ranking is worked out from the priorities you set, not a judgement that one house is better. See questions and answers.